Capacity for the Future
Heat pumps. EV chargers. Home additions. Today's homes need more than 100 amps. We upgrade to 200A or 400A with clean, code-compliant work that passes inspection first time.
phone_in_talkGet a Quote � (910) 750-9262
Same circuit trips repeatedly. Your panel is undersized for the load.
Original panel? Likely 100A or less, undersized for modern needs.
Level 2 chargers pull 40-50 amps. Most older panels can't handle it.
Heat pumps and high-load equipment require dedicated circuits.
Adding square footage usually means adding capacity.
Still using fuses? It's well past time for an upgrade.
What's Included
One quote covers everything. No nickel-and-diming on the back end.
We handle the paperwork with the local AHJ.
Coordinated with Duke Energy or your utility.
200A or 400A service, brand-name panel (Square D, Eaton, Siemens).
Every breaker labelled. Documented circuit map handed off.
Type 2 surge protective device included on every upgrade.
We schedule the inspection, we meet the inspector, you sign off.
Free on-site assessment. Honest quote. Done right.